Sign In | Join Free | My hardware-wholesale.com |
|
Brand Name : ROTY
Model Number : RT-260SC
Certification : CE,ISO
Place of Origin : CN
MOQ : 1
Price : 48,500 USD
Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability : 2 sets/month
Delivery Time : 39DAYS
Packaging Details : Fumigation wooden case
After-sales Service Provided : Available to service machinery overseas
Usage : Porridge Pouch Packing
Soft Pouch Packing : 40-82 Bags/min
After Warranty Service : Free spare parts,Video technical support is provided
Power : 6500w
Material : Steel 304 (Carbon)
Core Components : PLC Engine
premade pouch packing machine
horizontal pouch packing machine
Instant Oatmeal film rolling packing
Our company, Shanghai Rutian Packaging Co., Ltd. has years of service experience in food, pharmaceutical, chemical, edible oil and other industries. And China's largest dairy company Yili, Nestle, and other food companies has chosen to cooperate with us. Our main service team has many years of working experience in bag packing. Our company is one of the top five packaging companies in China. Our factory covers an area of 5000 square meters and has more than 80 employees. We have been engaging in researching and producing packing machines for many years
This granule packing machine is suitable for automatic packaging of liquid of foods,medicine and chemicals industry, such as shampoo,body foam bath lotion,facial cream,ingredient oil,fruit sauce,tomato ketchup and etc.
Specification:
Model | RT-180S | RT-210S | RT-260S | RT-330S |
Pouch Types | Flat bag, or with optional Hanging hole, Zipper, Spout | |||
Pouch Size (mm) | 70 (Min.) | 70(Min.) | 80 (Min.) | 85(Min.) |
180-225(Max.) | 210-320(Max.) | 240-350(Max.) | 320-450 (Max.) | |
Volume (Max.) | 400ml | 1000ml | 1500ml | 2000ml |
Speed (bpm) | 30-60 | 30-60 | 30-60 | 30-70 |
Power (kw) | 3.5 | 4.5 | 5.5 | 6.5 |
Weight (kg) | 1000 | 2000 | 2300 | 3000 |
Work Principle:
Bag Types:
Real Picture in the workshop
Packing EXPO
After-sales service
1.Installation
The initial installation is NOT included with the professional ROTY team member. All installation with the ROTY team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
While ROTY team member arrives at the site for a complete and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days may vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours.
Q&A
International stardard wooden box for machine packing
![]() |
Automatic 6500W Stand Up Pouch Packing Machine Porridge Doypack Filling Machine Images |